Plymouth Christian Centre
Following on from the successful renovation and refurbishment of the outside of the church, PDC were invited back to project manage a full internal refurbishment of the main auditorium. The works included the redesign of the main stage area, installation of a new first floor glass balustrade and theatre style seating. New sound, lighting and audio visual systems were also installed along with the replacement of all fixtures/fittings and floor coverings. Liaison with sub-consultants, such as structural engineers was undertaken, to ensure the works specification was comprehensively prepared to ensure accurate tender quotations. Contract administration and site supervision was carried out, with the works completed on time and within the budget.